1
1
TL;DR: The U.S. Navy wants to build 15 massive new nuclear-powered battleships. They’ll cost a staggering $275 billion total (about $18–23 billion each), but America’s shipyards might not be big enough—or fast enough—to build them. Critics also wonder if giant ships make sense in an age of cheap, deadly drones.
In December 2025, the Trump administration announced a plan to build a brand-new fleet of 15 "Trump-class" battleships. These would be the largest surface warships the U.S. has built since World War II.
Think of it like this: If a regular Navy destroyer is a pickup truck, these new battleships are fully loaded 18-wheelers—over 3.5 times bigger than the ships we build today.
| Detail | What It Means |
|---|---|
| Number of ships | 15 |
| Timeline | First ship starts ~2028, last finishes ~2056 |
| Size | 35,000 tons each (huge!) |
| Power | Nuclear (like submarines & aircraft carriers) |
| Home base for building | Newport News Shipbuilding, Virginia |
Important Point: This is the most expensive surface ship program in U.S. history.
The Navy’s ship-buying budget for surface ships would jump by two-thirds:
That’s a $7 billion per year increase—just for this one program.
The administration says these battleships will be packed with sci-fi level weapons:
Think of each ship as a floating fortress that can strike anywhere, defend itself against swarms of drones, and stay at sea for months without stopping for gas.
Here’s where things get tricky. Money isn’t the only problem—capacity is.
| Shipyard | Current Job | Can Build Nuclear Ships? |
|---|---|---|
| Bath Iron Works (Maine) | Arleigh Burke destroyers | No |
| Ingalls Shipbuilding (Mississippi) | Arleigh Burke destroyers | No |
| Newport News Shipbuilding (Virginia) | Aircraft carriers + submarines | Yes |
Callout: "Lead ships almost always take longer and cost more than estimated." — Congressional Budget Office
Building a brand-new class of ship from scratch is like asking a bakery that makes cupcakes to suddenly build wedding cakes the size of a car. The first few will be slow, messy, and expensive—no matter how good the bakery is.
Not everyone thinks this is a smart investment.
"Does it make sense to put so much expensive weaponry and so many sailors on a single, potentially vulnerable platform?"
His concerns (and others’):
| What’s Happening | The Challenges |
|---|---|
| 15 new nuclear battleships planned | $275B total cost (highest ever for surface ships) |
| First ship ~2028, last ~2056 | Only ONE shipyard can build them (Newport News) |
| Packed with lasers, rail guns, hypersonics | That yard is already late on carriers & subs |
| Would double large-ship production by 2035 | Current programs: 6+ months late, 57% over budget |
| Budget jumps from $11B → $18B/year | Critics: vulnerable to cheap drones & missiles |
Bottom line: The vision is bold. The tech is futuristic. But the industrial base might not be ready, and the strategic logic is debated. Congress will have to decide if this fleet is the best use of a quarter-trillion dollars.
President Trump announced the program and said the ships would bear his name—similar to how the Ford-class carriers are named after President Gerald Ford. It’s not yet an official Navy designation.
They’re 35,000 tons—over 3.5 times larger than the Arleigh Burke destroyers (9,500 tons) that make up the bulk of today’s surface fleet. They’re closer in size to World War II battleships.
The first ship of any new class ("lead ship") includes all the design, engineering, tooling, and "figuring it out" costs. Subsequent ships benefit from that work—like how the first iPhone cost billions to develop, but each unit after costs far less to make.
Building a nuclear-capable shipyard takes a decade+ and billions of dollars. You need specialized cranes, radiation shielding, trained nuclear welders, and security clearances. It’s not like opening a new factory.
The program stays a plan on paper. The Navy would continue buying Arleigh Burke destroyers and Constellation-class frigates—smaller, cheaper, proven ships that shipyards can build (even if late).
Article based on Congressional Budget Office reports and CNN reporting (August 2026). All figures in FY2025 dollars unless noted.